Building Control

We set building consent fees and charges annually through the Annual Plan process. They are indicative only.

If the cost of services provided in the building consent process exceeds the fee stated below, additional costs may be charged at the current hourly rate of $102.00.

All fees are payable in advance, when you apply for your building consent. The fee covers inspections and the provision of a code compliance certificate upon satisfactory completion of the work.

Building consent fees estimator

Estimate your building consent fees for work up to $1,000,000 in value. This calculator is for building consents which include both building and plumbing/drainage work. For building only or plumbing/drainage only consents, please contact council

All estimates are GST inclusive.

Fees are ONLY an estimate until confirmed by Building Control.

  1. Estimated value of work
    (eg. 20000 - Round up to the nearest $1000)
    $
  2.  
  3. PIM fee (estimate only) $
  4. Consent fee (estimate only) $
  5. BRANZ/DBH levy* (estimate only) $
  6.  
  7. TOTAL FEES (estimate only)
    (PIM + Consent + BRANZ/DBH levy)
    $

* The Building Research Association New Zealand (BRANZ) and Department of Building and Housing (DBH) combined levy of $2.97 per $1,000 on values of $20,000 and over is to be paid in addition to the total fee. This includes the first $20,000.

For work valued over $1,000,000, or to confirm your estimate, contact Building Control.

Other building consent fees

Flat Fees

A flat fee of $245 for building consent (including PIM), or $55 for a PIM only, applies for the following types of work:

  • Space heaters
  • Demolition (per building) *
  • Marquees
  • Signs & scaffolding
  • Pole signs
  • Verandah signs
  • Swimming Pool Fences
  • Fire alarm protection system (plus $95.00/hr)

* The Building Research Association New Zealand (BRANZ) and Department of Building and Housing (DBH) combined levy of $2.97 per $1,000 on values of $20,000 and over is to be paid in addition to the total fee. This includes the first $20,000.

Top of this page

Other general fees

Description Charge
Certificate of Acceptance Based on value of work
Certificate for Public Use $96 deposit & $102.00/hr
Building Warrant Of Fitness
(BWOF) inspection charge
$95.00 per hour & $102.00 min
BWOF not received notification $36
BWOF return fee $96
BWOF return fee & form 12 $132
BWOF Request for more information $36
Building Compliance Certificate
(Sale of Liquor Act)
$96
Amended plan application $96 (deposit only)
$102/hr thereafter
Current hourly rate $102.00
Lapsed consent inspection fee $96/inspection
Consideration of Schedule 1
Exemptions
$102/hr
Submit as-built plan for
Schedule 1 exempt building
work for filing on Council
records
$34
Consent Exemption Fee (item K) $96
S71-S76 hourly rate plus
LINZ Lodgement Fee
$102/hr
Certificate of Title $10
Building consent lists $278 /annum
Building consent lists $28 /month

Top of this page

Drainage fees and charges

Drainage connection fees are additional to building consent fees.

Description Charge
After hours building & drainage inspections $193 each
Sewer connections
Foul Sewer connection fee $350
Stormwater connection fee $350
Seal off fee $80
Private foul and stormwater drain in common application
This work will also require a building consent.
Two parties $128
Per each additional party $54
Site evaluation
On-site effluent disposal assessment $102.00/hr

Last reviewed: 28 May 2009 4:36pm


Dunedin City Council