We set building consent fees and charges annually through the Annual Plan process. They are indicative only.
If the cost of services provided in the building consent process exceeds the fee stated below, additional costs may be charged at the current hourly rate of $102.00.
All fees are payable in advance, when you apply for your building consent. The fee covers inspections and the provision of a code compliance certificate upon satisfactory completion of the work.
* The Building Research Association New Zealand (BRANZ) and Department of Building and Housing (DBH) combined levy of $2.97 per $1,000 on values of $20,000 and over is to be paid in addition to the total fee. This includes the first $20,000.
For work valued over $1,000,000, or to confirm your estimate, contact Building Control.
Other building consent fees
Flat Fees
A flat fee of $245 for building consent (including PIM), or $55 for a PIM only, applies for the following types of work:
- Space heaters
- Demolition (per building) *
- Marquees
- Signs & scaffolding
- Pole signs
- Verandah signs
- Swimming Pool Fences
- Fire alarm protection system (plus $95.00/hr)
* The Building Research Association New Zealand (BRANZ) and Department of Building and Housing (DBH) combined levy of $2.97 per $1,000 on values of $20,000 and over is to be paid in addition to the total fee. This includes the first $20,000.
Other general fees
| Description | Charge |
|---|---|
| Certificate of Acceptance | Based on value of work |
| Certificate for Public Use | $96 deposit & $102.00/hr |
| Building Warrant Of Fitness (BWOF) inspection charge |
$95.00 per hour & $102.00 min |
| BWOF not received notification | $36 |
| BWOF return fee | $96 |
| BWOF return fee & form 12 | $132 |
| BWOF Request for more information | $36 |
| Building Compliance Certificate (Sale of Liquor Act) |
$96 |
| Amended plan application | $96 (deposit only) $102/hr thereafter |
| Current hourly rate | $102.00 |
| Lapsed consent inspection fee | $96/inspection |
| Consideration of Schedule 1 Exemptions |
$102/hr |
| Submit as-built plan for Schedule 1 exempt building work for filing on Council records |
$34 |
| Consent Exemption Fee (item K) | $96 |
| S71-S76 hourly rate plus LINZ Lodgement Fee |
$102/hr |
| Certificate of Title | $10 |
| Building consent lists | $278 /annum |
| Building consent lists | $28 /month |
Drainage fees and charges
Drainage connection fees are additional to building consent fees.
| Description | Charge |
|---|---|
| After hours building & drainage inspections | $193 each |
| Sewer connections | |
| Foul Sewer connection fee | $350 |
| Stormwater connection fee | $350 |
| Seal off fee | $80 |
| Private foul and stormwater drain in common application | |
| This work will also require a building consent. | |
| Two parties | $128 |
| Per each additional party | $54 |
| Site evaluation | |
| On-site effluent disposal assessment | $102.00/hr |