Railway overbridge: photos of the repairs
These photos show the initial damage to the bridge in February 2008. After a period of liaison and consultation, work then began in July. The photos then show progress from July-September
Click on any of the thumbnails to open a larger image and then use the "next" or "previous" arrows to progress through the images.




