Resource Consent application - Under Section 93(2) of the Resource Management Act 1991.
Notified resource consent details
| Date notified | Saturday 26 May 2018 |
|---|---|
| Date closed | 25/06/2018 |
| Consent number | LUC-2018-208 |
| Notification type | Public notification |
| Name of applicant | Phillip and Heather Wilson |
| Location of site | 53 Nichols Road, Momona, being that land held in Computer Freehold Register OT6B/335 in the land parcel legally described as Lot 1 Deposited Plan 15229. |
| Hearing Date | 15 August 2018 at 10.30 am |
| Application description | Resource consent is sought to remove the Monkey Puzzle Tree (Araucaria araucana) which is listed in Schedule 25.3 as T854 in the Operative Dunedin City District Plan. The description of the tree location in the Operative Plan is incorrect. The schedule identifies the correct address but the incorrect legal description Lot 2 Deposited Plan 15229. The reference number and marker on the Planning Map show the tree being located on 55 Nichols Road. The physical location of the tree is within Lot 1 DP 15229, 53 Nichols Road and the trunk is located approximately 8m from the Nichols Road front boundary. The removal of a scheduled tree is assessed as an unrestricted discretionary activity under the Operative Dunedin City District Plan. The Proposed Plan (2GP) was notified on 26 September 2015, and some 2GP rules have immediate legal effect. In this instance, there are no relevant 2GP rules to consider. The application includes an assessment of environmental effects. |
| Date of decision | 25/09/2018 |
| Decision | Declined - remove a scheduled tree but granted consent to the pruning of deadwood |
Related documents
- LUC-2018-208 - Application (PDF, 2.7 MB, new window)
- LUC-2018-208 - Public Notice (PDF, 53.7 KB, new window)
- Evidence from Philip Wilson (PDF, 383.1 KB, new window)
- Evidence from Heather Wilson (PDF, 42.4 KB, new window)
- Background (PDF, 642.2 KB, new window)
- Site photographs (PDF, 2.2 MB, new window)
- Memorandum from Urban Designer (PDF, 2.5 MB, new window)
- Consultant Arborist's Report (PDF, 2.8 MB, new window)
- Processing Planner's Section 42A report (PDF, 1.9 MB, new window)
- Agenda page (PDF, 23.4 KB, new window)