Resource Consent application - Under Section 93(2) of the Resource Management Act 1991.
Notified resource consent details
| Date notified | 01/01/1970 |
|---|---|
| Date closed | 02/12/2015 |
| Consent number | LUC-2015-469 |
| Notification type | Public notification |
| Name of applicant | Blueskin Energy Limited |
| Location of site | 147 Church Road, Merton, being that land legally described as Lot 1-2 Deposited Plan 473199 held in Computer Freehold Register 646829 |
| Hearing Date | 17 and 18 May 2016 (and 19 May 2016 if required). Hearing will be reconvening on 9 June 2016 at 10.00 am for the Commissioner to receive the Applicant's Right of Reply only |
| Application description | Resource consent is sought to establish a community owned wind farm on Porteous Hill near Warrington. The proposed facility will comprise 3 turbines. The full height of the turbines from ground level to rotor tip will be between 80-102m in height. The locational layout of the turbines is identified in the application as indicative and subject to adjustments. Layout adjustments will not result in the turbines being moved closer to dwellings. Earthworks will be required for the project to construct access tracks and excavate foundations. These are estimated to be up to 6500m3 in volume. Parts of the site are located within the North Coast Costal Landscape Preservation Area but the turbines are located outside the landscape area boundary. The proposal is assessed as a non-complying activity under the operative Dunedin City District Plan as wind farm activities are a utility that is not provided for in the operative Plan. The Proposed Second Generation District Plan (2GP) was notified on 26 September 2015. Community wind farms are intended to be a discretionary restricted activity under the 2GP. The proposed rules do not have immediate effect and at this time there are no relevant rules to consider. The 2GP objectives and policies must be taken into account. The application contains an assessment of effects that incudes expert reports on landscape, noise and ecological effects. |
| Date of decision | 12/07/2016 |
| Decision | Declined |
| Appeal reason | Appeal against decline of application |
| Appeal status | Completed |
| Appeal Decision | Council decision upheld – Appeal declined |
| Date of Appeal decision | 11 September 2017 |
Related documents
- Appendix F (PDF, 1.3 MB, new window)
- Appendix E (PDF, 134.2 KB, new window)
- Appendix D (PDF, 428.2 KB, new window)
- Appendix C3 (PDF, 6.8 MB, new window)
- Appendix C2 (PDF, 4.7 MB, new window)
- Appendix C1 (PDF, 835.0 KB, new window)
- Appendix B7 (PDF, 241.3 KB, new window)
- Appendix B6 (PDF, 1.3 MB, new window)
- Appendix B5 (PDF, 112.1 KB, new window)
- Appendix B4 (PDF, 48.1 KB, new window)
- Appendix B3 (PDF, 483.6 KB, new window)
- Appendix B2 (PDF, 539.9 KB, new window)
- Appendix B1 (PDF, 3.3 MB, new window)
- LUC-2015-469 - Submission form (PDF, 90.1 KB, new window)
- LUC-2015-469 - Public Notice (PDF, 60.4 KB, new window)
- Appendix A (PDF, 47.9 KB, new window)
- Blueskin Energy Resource consent application (PDF, 976.4 KB, new window)
- Application form (PDF, 978.5 KB, new window)
- Evidence from Geologist (PDF, 921.2 KB, new window)
- Evidence from Acoustics Engineer (PDF, 934.7 KB, new window)
- Evidence from Project Manager, Blueskin Energy Ltd (PDF, 5.5 MB, new window)
- Evidence from Landscape Architect (PDF, 4.1 MB, new window)
- Evidence from Ecologist (PDF, 990.5 KB, new window)
- Evidence from Janet Stephenson (PDF, 3.4 MB, new window)
- Evidence from Landscape Architect - photos & photomontages (PDF, 1.1 MB, new window)
- Evidence from Landscape Architect (PDF, 472.4 KB, new window)
- Evidence from Planning Consultant - Ben Farrell on behalf of the applicant (PDF, 3.7 MB, new window)
- Evidence from Landscape Architect on behalf of G Tait. Attachment 1 (PDF, 5.4 MB, new window)
- Evidence from Landscape Architect on behalf of G Tait (PDF, 201.2 KB, new window)
- Evidence from Ecologist on behalf of S Ryan, J Ashby and L & K Clayton (PDF, 1.1 MB, new window)
- Evidence from Landscape Architect on behalf of S Ryan, J Ashby and L & K Clayton (PDF, 6.6 MB, new window)
- Evidence from Landscape Architect on behalf of S Ryan, J Ashby and L & K Clayton. Appendices 1 to 14 (PDF, 7.0 MB, new window)
- Evidence from Landscape Architect on behalf of S Ryan, J Ashby and L & L Clayton (PDF, 299.6 KB, new window)
- Submissions (PDF, 10.9 MB, new window)
- Technical Reports and Reviews (PDF, 2.2 MB, new window)
- Summary of Submissions (PDF, 583.9 KB, new window)
- Agenda and Planner's Report (PDF, 767.3 KB, new window)
- Minute from Commissioner (PDF, 74.9 KB, new window)
- Procedural decision from Commissioner on the late submissions (PDF, 71.0 KB, new window)
- Commissioner instruction regarding evidence (PDF, 80.2 KB, new window)
- Letter to the applicant - right of reply guidance (PDF, 223.8 KB, new window)
- Legal advice from Anderson Lloyd to the Commissioner (PDF, 251.8 KB, new window)
- Montage photographs (PDF, 1.5 MB, new window)
- Proposed Conditions - Appendix 1 (PDF, 2.1 MB, new window)
- Proposed Conditions (PDF, 164.2 KB, new window)
- Letter providing engineering geological comments (PDF, 382.9 KB, new window)
- Evidence from Ecologist (PDF, 88.8 KB, new window)
- Evidence from Acoustics Expert (PDF, 139.8 KB, new window)
- Legal Counsel Submission. Appendix 4 (PDF, 516.0 KB, new window)
- Legal Counsel Submission - Appendix 3 (PDF, 1.7 MB, new window)
- Legal Counsel Submission - Appendix 2 (PDF, 200.4 KB, new window)
- Legal Counsel Submission - Appendix 1 (PDF, 382.5 KB, new window)
- Legal Counsel's Closing submission (PDF, 233.5 KB, new window)