Dunedin City Council – Kaunihera-a-rohe o Otepoti

Roadworks schedule (updated weekly)

This list does not include any road works being carried out by organisations such as CCL (water and wastewater maintenance), Chorus, the NZ Transport Agency (state highways) or companies carrying out work for businesses or residents.

Roadworks customer satisfaction survey: Please take a couple of minutes to fill in this questionnaire about roadworks in your area.

Road Works for the week of the 23rd November – 29th November 2026

Asphalt Surfacing:

  • Albert Street West
  • Blackhead Road
  • Bremner Street
  • Canberra Place
  • Christie Street
  • Easter Crescent West
  • Exeter Street
  • Harrow Street
  • Hillhead Road West
  • Maryhill Terrace
  • Mitchell Street East
  • Moereau Street
  • Nottingham Crescent
  • Oakwood Avenue
  • Passmore Crescent
  • Paterson Street
  • Preston Crescent
  • Queens Drive
  • Renfrew Street
  • Shortland Street
  • Sydney Street
  • Tanner Road North

Chipseal Surfacing:

  • Allen Street South
  • Bedford Parade
  • Brownville Crescent
  • Bruce Street
  • Butler Street
  • Chambers Street
  • Epsilon Street
  • Formby Street
  • Forth Street
  • Gamma Street
  • Hall Road Mosgiel
  • Laing Street
  • Leith Street
  • Oakland Avenue
  • Preston Crescent
  • Queensberry Street
  • Reeves Street
  • Renfrew Street
  • Ross Street (Roslyn)
  • Scott Street
  • Shandon Street
  • Shortland Street
  • Stevenson Avenue
  • Sydney Street
  • Tyne Street Mosgiel
  • Waikana Street
  • Waldron Crescent

Slurry Surfacing:

  • Fairley Street
  • Ross Street (Roslyn)
  • Tewsley Street
  • Tyne Street (Roslyn)

Maintenance Metalling: N/A

Footpath Repairs:

  • Church Road
  • Sidey Street

Kerb and Channel Repairs: N/A

Milling: N/A

Chipseal Repair: N/A

Levelling & Edgebreak:

  • Balfour Street
  • Blacks Road
  • Butler Street
  • Dudley Street
  • Henry Street
  • Lothian Street
  • Queen Street

Digouts:

  • Dalziel Road
  • Inverary Street
  • Mclaren Road
  • Otokia Road West
  • Prospect Row
  • Queen Street
  • Ruru Avenue

Pedestrian & Cycling Shared path:

Ditching:

  • Dalziel Road
  • Mt Cargill Road

Stabilising:

  • Bell Street
  • Chambers Street
  • Clyde Street
  • Dalziel Road
  • District Road
  • Hoylake Street
  • Hoylake Street
  • Leith Street North
  • School road
  • Stevenson Avenue

Shoulder Work: N/A

Drainage Works:

  • Grigor Street
  • Wallaces Ford

Road Safety Improvements: N/A

Capital Works:

3 Waters:

  • Kenmure – Barr Street closed to all through traffic between Kenmure Road and Mercer Street (Downer)
  • Kenmure – Elgin Road closed to one lane with Stop / Go traffic lights between Benhar Street and Buckingham Street –limited resident access available (Downer)
  • KV Hills area – Forresbank Avenue closed to through traffic, limited resident access available (McConnell Dowell)
  • Macandrew Bay – Portobello Road closed to one lane access with traffic lights at bottom of Marion Street (Fulton Hogan)
  • North East Valley – Beechworth Street / Ainslee Street traffic management in place – intersection closed during work hours. Resident access available with lowered speeds around work TMPs (Fulton Hogan)
  • North East Valley – Norwood Street closed to one lane at North Road end, managed by traffic lights (Fulton Hogan)
  • St Leonards / Burkes – Burkes Drive closed to all through traffic between Huia Street and Kiwi Street (Downer)

Transport:

  • Albany Street Connection project - Albany Street Lane closure - TMP in place (Isaac Construction)
  • CBD – Pipe Inspections and cleaning which may include road closures between 11.00pm to 6.00am
  • Gladstone Road North. TMP may be reinstated for remedial works on culvert and driveway near start of Tunnels Trail Track
  • Mosgiel Park and Ride facility construction (Gladstone Road South, Burns Street and Riccarton Road West). TMP in place (Isaacs Construction)
  • Sandpiper Street, to Portobello Road intersection – Drainage improvement works.
  • Emergency Erosion Protection Works – Restricted access along St Kilda Beach.
  • St Clair Esplanade Balustrade Refurbishment.

Slip Repairs will be undertaken on the following Roads/Streets: N/A

Pavement Rehabilitations: N/A

Bridge Repairs: N/A

Retaining Walls:

  • Sidey Street

Kerb and Channel Renewals:

  • Anzac Square
  • Burns Street (Port Chalmers)
  • Dalziel Road
  • Mihiwaka Road
  • Roy Crescent
  • Slant Street
  • Stafford Street
  • Willis Street

Asphalt

  • Albany Street – between George and Queen Streets
  • Calder Avenue

Chipseal

  • Balfour Street
  • Leicester Street
  • Lothian Street
  • Lucan Street
  • Pine Hill Road
  • Queensberry Street
  • Riego Street
  • Tasman Street

Slurry: N/A

Footpath Resurfacing: N/A

Streetlights: N/A

Service Covers:

  • Anderson Bay Road
  • Forbury/ Bay View Roundabout
  • Great Kind Street
  • Highgate/ Drivers Road
  • Thomas Burns Street
  • Warrender Street
  • Wharf Street

Vegetation Spraying:

Undertaking Noxious Plant spraying, Roadside weed spraying, Kerb and Footpath weed spraying around the city and surrounds as weather and ground conditions permit.

Roadside Drainage Improvements Drainage repairs – Traffic Management in place

Flood Response and Slip repairs – Traffic Management in place (including temp speed limits & road closures as required) ongoing. PLEASE CHECK DCC WEBSITE FOR ROAD CLOSURES.

Work is being undertaken with temporary traffic management and speed limits in place.

If travelling in these areas, please allow extra time to arrive at your destination. These projects may be subject to change.

Still didn't find what you were looking for?