This list does not include any road works being carried out by organisations such as CCL (water and wastewater maintenance), Chorus, the NZ Transport Agency (state highways) or companies carrying out work for businesses or residents.
Roadworks customer satisfaction survey: Please take a couple of minutes to fill in this questionnaire about roadworks in your area.
Road Works for the week of 22nd December 2025 to 18th January 2026
Chipseal Surfacing: Week starting 12 January 2026
- Chain Hills Road
- Knox Street – Road closed residents access
- London Street – Road closed between Filleul Street and Scotland Street
- Ross Street
Asphalt Surfacing: N/A
Slurry Surfacing: N/A
Maintenance Metalling: N/A
Footpath Repairs: Week starting 12 January 2026
- Blanc Avenue
- Elwyn Crescent
- Grandvista Drive
- Orr Street
- Unsworth Street
- Walton Park Avenue
Kerb and Channel Repairs: N/A
Milling: N/A
Chipseal Repair: N/A
Levelling & Edgebreak: N/A
Digouts: Week starting 12 January 2026
- Brockville Road
- Church Hill Road
- Corstorphine Road – Road closed
- Moreau Street
- Mt Cargill Road
- Purakaunui Road
- Taieri Road
- Thomson Street – Road closed residents only
Pedestrian & Cycling Shared path: N/A
Ditching: Week starting 5 January 2026
- Paterson Road
- Precelly Street
- Riccarton Road - Full length both sides
- Grey Street
- Castleton Street
Week starting 12 January 2026
- Blackhead Road
- Queens Drive
Stabilising: Week starting 12 January 2026
- Allen Road South – Road closed residents access
- Beta Street
- Bright Street
- Brighton Road - (Weir Street to Blackhead Road)
- Burns Street, Mosgiel
- Clyde Street, Mosgiel
- Galloway Street
- Hall Street, Mosgiel – Road closed residents only
- Kinmont Crescent
- Maryhill Terrace
- McDonald Street, Mosgiel
- Newport Street
- Oakwood Avenue
- Tyne Street, Mosgiel – Road closed residents access between Souter Street and Melville Street, and Forth Street and Forfar Street
Shoulder Work: N/A
Drainage Works: Week starting 5 January 2026
- Hoopers Inlet Road
- Pukerangi Road
Week starting 12 January 2026
- Loan Metal Road
Road Safety Improvements: N/A
Capital Works:
3 Waters:
Week starting 22 December 2025
All 3 Waters work will be paused over Christmas/ New Year break. All sites will be reinstated (either asphalt or gravel) and roads will be open – there may be limited TMPs in place where required.
Week starting 5 January 2026
- Kaikorai Valley Road – Enabling work to install manhole prior to Transport rehabilitating Kaikorai Valley Road at corner of Barr Street. Traffic not able to access Barr Street from Kaikorai Valley Road.
Week Starting 12 January 2026
- North East Valley – Crown Street closed to Paris Street. Limited resident access available (Fulton Hogan)
- North East Valley – Selwyn Street closed from Paisley Ave across bridge to end of street. Limited resident access available (Fulton Hogan)
- St Leonards – St Leonards Drive closed between Robin Lane and Pukeko Street. Resident access available, access to school via Pukeko Street only (Downer)
- Blanket Bay – SH88 one lane closed between Roseneath and St Leonards, managed by Stop/Go signs and traffic lights. Blanket Bay Road closed to all traffic at St Leonards end (McConnell Dowell)
- Mosgiel – Murray Street closed between Reid Avenue and Nairn Street (including Oban Street intersection), detours in place. Resident access available (Downer)
- Mosgiel – Nairn Street closed to through traffic. Resident access available (Downer)
- Kenmure – Blair Street closed to all through traffic, detours in place. Limited resident access available (Downer)
- Kenmure – Barr Street one lane only between Kaikorai Valley Road and Mercer Street. Downhill traffic only. No access available from Kaikorai Valley Road, Kenmure Road closed to all traffic at Barr Street. (Downer)
Transport:
- CBD – Pipe Inspections and cleaning which may include road closures between 11.00pm to 6.00am
- Sandpiper Street, to Portobello Road intersection – Drainage improvement works.
Slip Repairs will be undertaken on the following roads / streets: Week starting 5 January 2026
- Highcliff Road closed for 100m at address 1299 Highcliff Road
Pavement Rehabilitations:
- Old Brighton Road – closed at Jeffcoates Road end. No through traffic
Bridge Repairs: Week starting 12 January 2026
- George King Memorial Drive - bridge 55 and 56 closed for re-decking
Retaining Walls:
- Brown Street
Kerb and Channel Renewals:
- Boomer Street
Footpath Resurfacing: N/A
Streetlights: N/A
Service Covers:
- Coach Road
- Factory Road
- MacLaggan Street
- Princes Street
- Serpentine Avenue
- Signal Hill Road
- Stone Street
- Taieri Road
- Thomas Burns Street
- Wharf Street
Vegetation Spraying:
Undertaking Noxious Plant spraying, Roadside weed spraying, Kerb and Footpath weed spraying around the city and surrounds as weather and ground conditions permit.
Roadside Drainage Improvements Drainage repairs – Traffic Management in place
Flood Response and Slip repairs – Traffic Management in place (including temp speed limits & road closures as required) ongoing. PLEASE CHECK DCC WEBSITE FOR ROAD CLOSURES.
Work is being undertaken with temporary traffic management and speed limits in place.
If travelling in these areas, please allow extra time to arrive at your destination. These projects may be subject to change.