This list does not include any road works being carried out by organisations such as CCL (water and wastewater maintenance), Chorus, the NZ Transport Agency (state highways) or companies carrying out work for businesses or residents.
Roadworks customer satisfaction survey: Please take a couple of minutes to fill in this questionnaire about roadworks in your area.
Road Works for the week of 17th November 2025 to 23rd November 2025
Chipseal Surfacing:
- Botting Place
- Duke Street, Mosgiel
- Heath Street
Asphalt Surfacing:
- Moray Place – Nightworks – From Princes Street to Great King Street
Slurry Surfacing:
- Agnes Street cul-de-sac
- Bishop Verdon Close cul-de-sac
- Botting Place cul-de-sac
- Duke Street, Mosgiel cul-de-sac
- Green Street cul-de-sac
- Heath Street cul-de-sac
- Milburn Street cul-de-sac
Maintenance Metalling: N/A
Footpath Repairs: N/A
Kerb and Channel Repairs:
- Burns Street, Mosgiel
- Gordon Road, Mosgiel
- Main South Road, Green Island
Milling: N/A
Chipseal Repair:
- Benfell Street
- Beresford Street
- Blackhead Road
- Brockville Road
- Cranley Street
- District Road, Green Island
- Gebbie Street
- Honeystone Street
- Kinmont Crescent
- Lothian Street
- Paterson Street
- Roy Crescent
- Somerville Street
- Thomas Street – South, Waikouaiti
Levelling & Edgebreak: N/A
Digouts:
- Chapman Street
- Drivers Road
- Franklin Street
- Howard Street
- Norman Street
- Oxley Crescent
Overlays:
- Bath Street, Brighton
- Chain Hills Road
- Easther Crescent
- Gladstone Road North
- Irvine Road
- Irvine Street
- Leith Street North
- Morris Road, Saddle Hill
- North Taieri Road
- Queens Drive, St Kilda
- Tyne Street, Mosgiel
- Viscount Road
Pedestrian & Cycling Shared path: N/A
Ditching:
- Cape Saunders Road
- Creamery Road
- Irvine Road
- Papanui Inlet Road
Stabilising:
- Archibald Street
- Balfour Street
- Coast Road
- Cranley Street
- Gladstone Road North, Mosgiel
- Henry Street, Port Chalmers
- Kowhai Street
- Somerville Street
- Tomahawk Road
Shoulder Work: N/A
Drainage Works:
- District Road, Green Island
- Highcliff Road
- Wickliffe Street, Mosgiel
Road Safety Improvements: N/A
Capital Works:
3 Waters:
- North East Valley – Felix Street and Allen Street closed. Limited resident access only (Fulton Hogan)
- North East Valley – Northumberland Street closed for resident access only (Fulton Hogan)
- North East Valley – Paris Street closed between Northumberland Street to Carr Street, resident access only available (Fulton Hogan)
- North East Valley – Coburn Avenue closed, limited resident access only (Fulton Hogan)
- St Leonards – St Leonards Drive closed between Ruru Avenue and Pukeko Street. Resident access available, access to school via Pukeko Street only (Downer)
- Roseneath – SH88 one lane closed between Roseneath and St Leonards, managed by Stop / Go signs and traffic lights (McConnell Dowell)
- KV Hills – Lynn Street closed between Prospect Bank and Rosebank Avenue, closed to all through traffic, limited resident access available. Detours in place (Fulton Hogan)
- Mosgiel – Murray Street closed between Reid Avenue and Nairn Street (including Oban Street intersection), detours in place (Downer)
- Mosgiel – Nairn Street closed to through traffic. Resident access available (Downer)
Transport:
- CBD – Pipe Inspections and cleaning which may include road closures between 11.00pm to 6.00am
- Sandpiper Street, to Portobello Road intersection – Drainage improvement works
- St Andrew Street between Filleul Street and Great King Street will be one way for 2 November -8 November to complete final defect remediation of pavers in the intersection and allow mortar to dry. Works will mostly be undertaken at night, but traffic management will remain in place during the day.
Slip Repairs will be undertaken on the following roads / streets:
- Tomahawk Road – Intermittent road closure after Centre Road towards Smaill’s Beach
- Wickliffe Street, Port Chalmers – Shoulder Closure.
Pavement Rehabilitations: N/A
Bridge Repairs: N/A
Retaining Walls:
- Brown Street
Kerb and Channel Renewals:
- Boomer Street
Footpath Resurfacing: N/A
Streetlights: N/A
Service Covers:
- Coach Road
- Factory Road
- MacLaggan St
- Princes Street
- Serpentine Avenue
- Signal Hill Road
- Stone Street
- Taieri Road
- Thomas Burns Street
- Wharf Street
Vegetation Spraying:
Undertaking Noxious Plant spraying, Roadside weed spraying, Kerb and Footpath weed spraying around the city and surrounds as weather and ground conditions permit.
Roadside Drainage Improvements Drainage repairs – Traffic Management in place
Flood Response and Slip repairs – Traffic Management in place (including temp speed limits & road closures as required) ongoing. PLEASE CHECK DCC WEBSITE FOR ROAD CLOSURES.
Work is being undertaken with temporary traffic management and speed limits in place.
If travelling in these areas, please allow extra time to arrive at your destination. These projects may be subject to change.