The roading and footpaths group includes activities and services related to transport.

The DCC provides for the planning, construction, maintenance, and upgrading of Dunedin’s roads and footpaths. This includes making sure street lighting is adequate, traffic signals and road marking are functioning and clear, and cycle ways and footpaths are fit for purpose for Dunedin’s communities.

The transport network is vital to Dunedin’s economy and is an important contributor to the lifestyle of every Dunedin resident as they move about the city. It is DCC's role to maintain and upgrade the transport network to meet all relevant legislative requirements.

Community outcomes

The roading and footpaths group contributes to the following community outcomes:

  • A connected city with a safe, accessible and low-carbon transport system
  • A supportive city with caring communities and a great quality of life
  • A successful city with a diverse, innovative and productive economy
  • An active city with quality and accessible recreational spaces and opportunities
  • A sustainable city with healthy and treasured natural environments
  • A compact city with a vibrant CBD and thriving suburban and rural centres

Significant negative effects

No significant negative effects are currently identified, but examples of potential negative effects on the local community are:

  • Air pollution: added emissions due to congestion.
  • Water resource pollution: detritus from roads entering drainage systems and waterways.
  • Land resource pollution from dust.
  • Constricted traffic flow resulting in longer transport time.
  • Limits on loading resulting in more trips to move tonnage.
  • Road roughness affecting vehicle operating costs.
  • Noise, vibration and /or pollution from road works.
  • Pedestrian safety (accidents).
  • Accessibility during road construction.
  • Visual impacts on landscape.
  • Effects on archaeological sites, heritage areas, and/or areas of cultural significance.

Efforts are made to mitigate any negative effects through planning and consultation with the community. The Council ensures that contractors follow accepted environmental practices while undertaking construction and maintenance. Ongoing monitoring of the effects of operation is undertaken and action taken to remedy any issues arising.

Measuring performance

Measure Data Source Actual Year 2 2022/23 Target 2024/25
Level of service:The transport network facilitates efficient travel
Percentage of residents satisfied with overall roading and maintenance ROS 27% >60% 
Average travel time by car on five key urban routes at peak time (7.30-9.00am) Route 1-St Clair to Octagon Travel Time Survey 11.05 min <15 minutes
Route 2-Normanby to Octagon 15.32 min <15 minutes
Route 3-Mosgiel to Octagon 20.41 min <22 minutes
Route 4-Brockville to Octagon 8.15 min <15 minutes
Route 5-Waverley to Octagon 12.32 min <15 minutes
Average travel time by bus on key urban routes at peak time  * Route 1-St Clair to bus hub Measured by ORC 19.25 min 29 minutes
Route 2-Normanby to bus hub 16.75 min 27 minutes
Route 3-Mosgiel to bus hub (via Fairfield and Green Island) 40.5 min 37 minutes
Route 4-Brockville to bus hub 18.5 min 20 minutes
Route 5-Waverley to bus hub 23.15 min 28 minutes
Level of service: The transport network facilitates active travel*
Percentage of residents satisfied with the suitability of the road network for cyclists throughout the city * ROS 28% >30% 
Percentage of residents satisfied with condition of footpaths throughout the city * ROS 35% >60% 
Percentage of residents satisfied with the ease of pedestrian access throughout the city * ROS 56% >65% 
Percentage of residents satisfied with condition of the streetlights throughout the city ROS 61% >75% 
Average cycle count movements in the city where cycling counters are available. * Cycle counters 118 average daily movements per counter Grow year on year
Level of service: The transport network facilitates accessibility
Percentage of residents satisfied with parking availability in the central city ROS 21% >45% 
Level of service: The transport network facilitates safe travel
The change from the previous financial year in the number of fatalities and serious injury crashes on the local road network expressed as number (DIA measure) Waka Kotahi NZTA  An increase of 17 crashes with fatalities or injuries Reducing each year
Level of service: The transport network facilitates comfortable travel
The average quality of ride on local sealed road network measured by smooth travel exposure (DIA measure) RAMM 75.60% Smooth travel exposure >80%
Level of service: The transport network facilitates sustainable maintenance
Percentage of sealed road network that is resurfaced (DIA measure) Internal data 6.0% of the network Target (m2) equating to 6% of the network
Percentage of footpaths within the level of service standard adopted by the Council Asset Management Plan (DIA measure) RAMM  7.30% <15% of network is rated poor or very poor
Level of service: The network is maintained in a responsive manner
Percentage of service requests relating to roads and footpaths to which the response is provided within five working days (DIA measure) Internal data 85% >90% each year
Level of service: The use of electric vehicles (EV’s)is supported *
The number of publicly available fast charging stations for EVs in Dunedin is increasing * Waka Kotahi NZTA 6 EV charging stations Increase on June 2020 baseline
The number of electric vehicles (plug in hybrids and pure EVs including heavy vehicles, registered in Dunedin is increasing * Ministry of Transport / Te Manatū Waka  6.127
Annual sales volumes of petrol and diesel in Dunedin city. * Petrol Annual Dunedin Energy Study/ Dunedin Green-house Gas Inventory 53.97 million litres Decrease year on year
Diesel 94.2 million litres
Level of service: Minimising transport disruption during and after the construction of the new Dunedin Hospital rebuild will be supported through the Shaping Future Dunedin project
Provide an alternative route (harbour arterial route) that bypasses the central city Internal data In progress By 30 June 2027
Provide a Parking Wayfinding System to direct drivers to selected off street parking facilities Internal data In progress By 30 June 2027
Provide bus priority at the intersections where bus delays are currently experienced in the Princes St (Kensington to Moray Pl) and Andersons Bay Rd(Caversham Motorway to Princes St) areas Internal data In progress By 30 June 2024
Provide a safe route for cyclists and pedestrians from the Anzac Ave and Thomas Burns shared path to the Hospital and central city, and from the Harbour walkway/cycleway to the city centre and tertiary areas Internal data In progress By 30 June 2026
Provide Park and Ride sites at Mosgiel and Burnside Internal data In progress By 30 June 2024
Provide bike hub facilities for secure storage in North Dunedin, the central city and South Dunedin/the Oval Internal data In progress By 30 June 2026

* levels of service statements and measures that will help monitor progress towards Council’s zero carbon 2030 target.

ROS - Residents’ Opinion Survey

Dunedin City Council Funding Impact Statement for the Year Ended 30 June 2024 for Roading and Footpaths
(shown in $000s) 2023/24 Annual Plan 2024/25 Long-term plan 2024/25 Annual Plan
Sources of operating funding
General rates, uniform annual general charges, rates penalties 23,882 27,501 33,958
Targeted rates 37 36 40
Subsidies and grants for operating purposes 8,953 10,900 8,984
Fees and charges 1,942 1,231 2,154
Internal charges and overheads recovered 0 0 263
Interest and dividends from investments 0 0 0
Local authorities fuel tax, fines, infringement fees, and other receipts 900 925 900
Total operating funding (A) 35,71440,593 46,299
 
Applications of operating funding
Payments to staff and suppliers 24,745 26,367 25,851
Finance costs 6,142 3,124 7,886
Internal charges and overheads applied 1,919 1,970 1,976
Other operating funding applications 0 0 0
Total application of operating funding (B) 32,80631,461 35,713
 
Surplus/(deficit) of operating funding (A-B) 2,9089,132 10,586
 
Sources of capital funding
Subsidies and grants for capital expenditure 19,762 16,641 13,732
Development and financial contributions 720 503 721
Increase/(decrease) in debt 26,954 17,040 15,052
Gross proceeds from sale of assets 0 0 0
Lump sum contributions 0 0 0
Other dedicated capital funding 0 0 0
Total sources of capital funding (C) 47,43634,184 29,505
 
Application of capital funding
Capital expenditure    
- to meet additional demand 0 1,741 1,217
- to improve the level of service 28,261 17,145 5,987
- to replace existing assets 22,083 30,030 32,887
Increase/(decrease) in reserves 0 0 0
Increase/(decrease) of investments 0 -5,600 0
Total application of capital funding (D) 50,34443,316 40,091
 
Surplus/(deficit) of capital funding (C-D) -2,908-9,132 -10,586
 
Funding balance ((A-B)+(C-D)) 00 0