Current Alerts and Notices (View all)

Road conditions(1) Water shutdowns(2)

Dunedin City Council – Kaunihera-a-rohe o Otepoti

Single Submission Viewer - Variation 2

Submission point number/s: S148.001

Click on each heading to view the submission details

  • Submitter and address for service details

    Reference: 808360

    Name Elizabeth Prior
    Organisation (if applicable)
    Contact person/agent (if different to submitter)

    Postal address (address for service)

    1 Napier Street Belleknowes Dunedin 9011
    Email address:
    Contact phone number: 4535455

  • Hearings

    Do you wish to speak in support of your submission at a hearing Yes
    If others make a similar submission, would you consider presenting a joint case at a hearing Yes

  • Trade competition

    I could gain an advantage in trade competition through this submission No
    My submission relates to an effect that I am directly affected by and that: a. adversely affects the environment; and b. does not relate to trade competition or the effects of trade competition.

  • Submission

    Variation 2 change ID Change IN05
    Provision name and number, or address and map layer name Rezoning from general residential 1 to general residential 2 mornington
    My/our submission seeks the following decision from the Council: Reject the change
    Details
    Reasons for these views The existing infrastructure is inadequate to support increased housing density between Hawthorn Avenue and Napier Street. The storm water course is an open creek in a gully between 1,5 and 7 Napier streets and 46A and 46B Hawthorne Avenue and 40B Hawthorn Avenue. The creek is piped at the boundary of 1 Napier Street and 2 Beaumont Road. The pipe diameter is not large enough for the volume of water generated by heavy rain. There are two back up access points to the storm water pipe on the land at 2 Beaumont Road that shares a boundary with 34A Hawthorn Avenue, flooding of the low-lying parts of 2 Beaumont Road and 1 Napier Street occur when pipe and storm water access block with leaves, debris etc. Piping and the storm water into the creek from 40B Hawthorn Avenue has recently taken place at the boundary with 1 Napier Street which has increased the intensity of water flow close to the storm water pipe.

Submission documents

Submission that have been deemed to have 'Out of scope' submission points have had a pdf attached showing the Out-of-scope points highlighted.

No associated documents with this submission.

Still didn't find what you were looking for?