Road Works for the week of 13th to 19th July 2026

Asphalt Surfacing: N/A

Chipseal Surfacing: N/A

Slurry Surfacing: N/A

Maintenance Metalling:

  • Hayward Point Road

Footpath Repairs:

  • Beach Street
  • Botha Street
  • Main South Road

Kerb and Channel Repairs:

  • Cranley Street
  • Marne Street

Milling: N/A

Chipseal Repair: N/A

Levelling & Edgebreak:

  • Green Island Bush Road
  • Hillhead Road

Digouts:

  • Beach Street, Waikouaiti
  • Moonlight Road

Pedestrian & Cycling Shared path: N/A

Ditching:

  • Beach Street, Waikouaiti
  • Killarney Street
  • North Road
  • Queens Drive

Stabilising: N/A

Shoulder Work:

  • Brighton Road
  • Camp Road
  • Centre Road
  • Factory Road
  • Green Island Road
  • Highcliff Road
  • Milners Road
  • Otokia Road West
  • Silverstream Valley Road
  • Taieri Mouth Road

Drainage Works:

  • Barewood Road
  • Gladfield Road
  • Marks Road
  • McKinnon Road
  • Moonlight Road
  • Service Road

Road Safety Improvements: N/A

Capital Works:

3 Waters:

  • Kenmure – Bernard Street closed at Elgin Road; access available via Stansfield Street (Downer)
  • Kenmure – Crewe Street closed to all traffic during working hours, Monday to Friday (Downer)
  • Kenmure – English Ave intersection closed due to work on Elgin Road, detours in place (Downer)
  • Kenmure –Elgin Road closed between Barr Street and Stanley Street – detours in place, limited resident access available (Downer)
  • KV Hills area – Shetland Street closed to all through traffic at Prospect Bank. Limited resident access available, detours in place for all traffic including bus service (McConnell Dowell)
  • KV Hills area –Forresbank Avenue closed to through traffic, limited resident access available (McConnell Dowell)
  • Macandrew Bay – Carpark opposite shops closed to all public traffic. Lane shift in place for traffic, pedestrian/cyclist access will be available. (Fulton Hogan)
  • Mosgiel – Bush Road closed to one lane managed by traffic lights, between Carlyle Road and Wal’s Plant land. No access available to Carlyle Road (McConnell Dowell)
  • Mosgiel – Carlyle Road closed at Bush Road intersection. Access available via Tyne Street (McConnell Dowell)
  • North East Valley – Beechworth Street/Afton Terrace/Ainslee Street traffic management in place – intersection closed during work hours. Resident access available with lowered speeds around work TMPs (Fulton Hogan)
  • North East Valley – Norwood Street closed to one lane, managed by traffic lights (Fulton Hogan)
  • North East Valley – Watts Road closed. Resident access available, detours in place where required (Fulton Hogan)
  • Northeast Valley – Norwood Street closed to all traffic near Forrester Park. Detour in place via North Road/Clava Street (Fulton Hogan)
  • St Leonards – Ruru Avenue closed between Takahe Terrace and SH88 for pump station renewal. SH88 occasionally one lane managed by traffic lights at Ruru Avenue (Fulton Hogan)
  • Waitati – Doctors Point Road reduced to one lane access with traffic lights. (McConnell Dowell)

Transport:

  • Albany Street Connection project - Albany Street Lane closure - TMP in place (Isaac Construction)
  • CBD – Pipe Inspections and cleaning which may include road closures between 11.00pm to 6.00am
  • Harbour Arterial – Stage 3 project; Strathallan Street/Portsmouth Drive/Wharf Street intersection. TMP in place (Fulton Hogan)
  • Mosgiel Park and Ride facility construction (Gladstone Road South, and Riccarton Road West)
  • Sandpiper Street, to Portobello Road intersection – Drainage improvement works
  • St Clair Esplanade Balustrade Refurbishment

Slip Repairs will be undertaken on the following Roads/Streets: N/A

Pavement Rehabilitations:

  • Kaikorai Valley Road – Barr Street to Townleys Road

Bridge Repairs: N/A

Retaining Walls: N/A

Kerb and Channel Renewals: N/A

Footpath Resurfacing: N/A

Streetlights: N/A

Service Covers: N/A

Vegetation Spraying:

Undertaking Noxious Plant spraying, Roadside weed spraying, Kerb and Footpath weed spraying around the city and surrounds as weather and ground conditions permit.

Roadside Drainage Improvements Drainage repairs – Traffic Management in place

Flood Response and Slip repairs – Traffic Management in place (including temp speed limits & road closures as required) ongoing. PLEASE CHECK DCC WEBSITE FOR ROAD CLOSURES.

Work is being undertaken with temporary traffic management and speed limits in place.

If travelling in these areas, please allow extra time to arrive at your destination. These projects may be subject to change.

Still didn't find what you were looking for?